Installation Guidance | Ilam Stone. Ilamstone’s range of Cast Stone is a excellent example of time honored craftsmanship combined with modern technology working together in perfect harmony. The result is a wide range of Cast Stone products of exceptional quality with no compromise to aesthetic appeal. Installation of cast stone should be carried out by experienced operatives. Stooled Cills – To prevent cracking after installation only the ends and cill joints should be bedded on mortar. The joint below should be left open and pointed up after the brickwork is finished. Slip Cills – Should be fully bedded down on mortar. Decorative Heads – Should be used in conjunction with a suitable load- bearing lintel. To reduce the risk of cracking, the Head should be fully bedded down on mortar along the entire length of the load- bearing lintel. How To Install Stone FacingThis ensures that any load above the Head is fully and equally distributed on the load- bearing lintel. Movement Joints – Vertical movement joints should occur at intervals of 6 meters in long lengths of walling. Mortar Recommendations – Premixed coloured mortars are available containing lime, we would recommend that a grade of 1: 1: 6 (Cement: Lime: Washed Sand) is used as this will give a lower permeability and give a greater resistance to rain penetration. In addition, voids and hairline cracks, which may develop in lime mortars, tend to seal themselves over a period of time. ![]() Fixings. Cast in Stainless Steel Dove Tail Anchor Slots (1. Window & Door Jambs (with an appropriate Wall Tie). M1. 0 and/or M1. 2 Fixing Inserts are provided in ‘Portico’ assemblies. M1. 2 and/or M1. 6 Lifting inserts can be incorporated in heavy units (at an additional cost), it is important to observe the relevant advice for ‘Manual Handling on site ’ in order for the Specifier to meet their CDM Regulations responsibilities. ![]()
Location dowel holes can be provided in units such as Balustrade Pillars, Window and Door Jambs, Mullions, Heads and Cills and in certain instances the ends of Copings to accommodate stainless steel or polypropylene pins (supplied by others) and proprietary fixing systems (also supplied by others). Handling. Wet Cast Product. For health and safety reasons all Cast Stone Dressings greater than 6. M1. 2 fixing or lifting sockets for use in conjunction with lifting loops (supplied as necessary) can be incorporated, on request. Items that require more than one lifting eye should only be lifted by use of a lifting beam so that side loads are not imposed on the sockets. In certain cases, sockets are included to assist factory handling. Stanton Cast Stone is our brand of decorative cast stone products. Cast Stone Corbels; Cast Stone. deliver and install a variety of structural. Architectural precast keystone corbels. Older and more traditional trims were made from carved marble or granite/stone. they are easy to install and. Beautiful cast stone mantel shelf. Install corbels on to the masonry by attaching the brackets with 3/8" x 4" lag screws using suitable anchors. HALFEN - Introduction - BRA- L4 - Parapet Corbels - Concrete pre- cast systems. HALFEN parapet corbels are used to fix pre- cast parapet panels to. They are cast. into the pre- cast parapets and transported to site. To ensure a uniform distribution of the load, 2 anchors can be used. The resistances of the design are confirmed by a type. When fixing them to cast- in HALFEN channels, the anchors can be. They can also be adjusted. HALFEN offers suitable mounting accessories. The parapet corbels are also available with adjustable. How To Install Stone Siding
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
November 2017
Categories |